Video: Per-day resource availability
The To Plan: Resources view has a per-day availability status grid. Each date in the selected planning range has one narrow column, with a single status icon per resource (available, planned, unavailable, rest day).
One view, accurate statuses, no manual cross-checking. This video shows how:
As explained in the video, each cell shows a single status icon:
- A checkmark means the resource is available, with no loads and no unavailability registered.
- A dash means it has a load planned or in progress that day.
- An ‘X’ means there’s an unavailability, like a training or vacation.
- And rest day means the date falls outside the resource’s shift schedule. This status only shows if a shift schedule has been configured on the resource.
