Planning
How-to videos on planning, trips and stops.
12 articles
- Video - How to auto-assign orders to an existing matching load?Load resource assignment rules can now add a new order to a load an earlier order already created, instead of always creating one load per order. On top of that, load templates give the matched load a fixed stop sequence.
- Video: How to remove a resource from a load without unplanning the load?Removing an order's assigned resource doesn't mean unplanning the whole load. On a multi-order load, it now opens a confirmation modal offering "Unplan order from load" (just this order) or "Unplan load" (everything).
- Video: how to customize the planning board layout?The planning board supports fully custom layouts. Instead of one fixed view, planners can split their screen into different arrangements and assign any planning component to any block. Layouts can be edited or deleted from the same toolbar selector.
- Video - How to manage orders and loads in the Distribution planning view?The Planning legs view is split into two stacked tables: orders still to plan on top, planned loads below. Planners can build, extend, and merge multi-stop loads directly from there instead of working from a flat, ungrouped list.
- Video: How to add a stop to a load from the open load detail?The open load detail popover on the planning board is now interactive. With one or more orders selected in the To plan list, planners can click directly on the route (Table or Blocks view) to insert and save.
- Video: How to add time window columns to the To plan overview?Planners can see and filter time windows directly on the To plan: Orders board. Planners can also filter orders by window name via that same header when the Split view is enabled for Order start, Order end, Load/unload (container), or Pickup/Delivery.
- Video: Assign the previous container or trailer to orders on a loadWhen planners added a reload to a load that already had a container on the delivery leg, that container didn't carry across. The only option was to open each order separately. Now, the previous container or trailer can be assigned in one go.
- Video: live freight totals on loadsFreight totals (loading meters, weight, volume, pallet spaces, quantity) update live on the planning timeline as orders are added to or removed from a load. As orders are dragged onto or off a load, the totals recalculate immediately.
- Video: Per-day resource availabilityThe To Plan: Resources view has a per-day availability status grid. Each date in the selected planning range has one narrow column, with a single status icon per resource (available, planned, unavailable, rest day).
- Video: How to use 'To plan: Loads' modeThe 'To plan: Loads' option in the planning board To plan dropdown lists every load that's still waiting for a real resource: both loads parked on a dummy resource and loads with no resource at all, gathered in one place.
- Video - How to assign compartmentalized trailers at load levelOrders can be added to specific compartments of a trailer at load level, displaying the trailer's compartment layout and allowing goods to be distributed across compartments via drag-and-drop or manual selection.
- Video: Automatic ETA recalculationAutomatic ETA recalculation continuously updates the estimated time of arrival at the next stop based on the driver's current GPS position.
