---
title: "Video: Per-day resource availability"
description: "The To Plan: Resources view has a per-day availability status grid. Each date in the selected planning range has one narrow column, with a single status icon per resource (available, planned, unavailable, rest day)."
url: https://help.qargo.com/us/articles/712523-video-per-day-resource-availability
locale: us
updated: 2026-06-22
---

# Video: Per-day resource availability

One view, accurate statuses, no manual cross-checking. This video shows how:

::embed{src="https://watchclueso.com/embed/dot3z1790yq3xf8r"}

:::callout{tone="warning"}
❗ To view the column, a **date range** must be specified in the planning board.
:::

As explained in the video, each cell shows a single status icon:

-   A **checkmark** means the resource is available, with no loads and no unavailability registered.
-   A **dash** means it has a load planned or in progress that day.
-   An **'X'** means there's an unavailability, like a training or vacation.
-   And **rest day** means the date falls outside the resource's shift schedule. This status only shows if a shift schedule has been configured on the resource.

:::callout{tone="note"}
💡 **When more than one status applies** on the same day, the most important one wins. In this order: unavailable, then planned, then rest day, then available.
:::


## Related articles

- [Planning — Per-day resource availability in To Plan: Resources](https://help.qargo.com/us/articles/712533-planning-per-day-resource-availability-in-to-plan-resources.md)
- [Resource availability overviews](https://help.qargo.com/us/articles/269363-resource-availability-overviews.md)
- [Planning: board filter options](https://help.qargo.com/us/articles/220218-planning-board-filter-options.md)
- [Setting resource availability](https://help.qargo.com/us/articles/133844-setting-resource-availability.md)
- [Planning – Trailer and container availability status on the resource board](https://help.qargo.com/us/articles/600484-planning-trailer-and-container-availability-status-on-the-resource-board.md)
