---
title: "Video - How to auto-assign orders to an existing matching load?"
description: "Load resource assignment rules can now add a new order to a load an earlier order already created, instead of always creating one load per order. On top of that, load templates give the matched load a fixed stop sequence."
url: https://help.qargo.com/us/articles/892727-video-how-to-auto-assign-orders-to-an-existing-matching-load
locale: us
updated: 2026-11-09
---

# Video - How to auto-assign orders to an existing matching load?

This video explains how to set up auto-assign rules and how this works in practice:

::embed{src="https://watchclueso.com/embed/lj0x7rxhbew76hdy"}

:::callout{tone="note"}
📚 A few things to know about load matching:

-   Matching only happens when an order is created, so loads made by hand, or before the rule was switched on, are never joined. There's no capacity check, so a load keeps taking orders however big it gets.
-   And once a load is dispatched or in progress, it stops accepting orders. Those orders stay in To plan for a planner to handle.
:::

Read more about load matching here: **[PLANNING - Auto Assign Resources](https://help.qargo.com/us/articles/407559-planning-auto-assign-resources)**.


## Related articles

- [Video: Assign the previous container or trailer to orders on a load](https://help.qargo.com/us/articles/718295-video-assign-the-previous-container-or-trailer-to-orders-on-a-load.md)
- [Loads - Load templates](https://help.qargo.com/us/articles/871449-loads-load-templates.md)
- [Video: How to add a stop to a load from the open load detail?](https://help.qargo.com/us/articles/769111-video-how-to-add-a-stop-to-a-load-from-the-open-load-detail.md)
- [Configuration - Use rules to auto-assign fields.](https://help.qargo.com/us/articles/545498-configuration-use-rules-to-auto-assign-fields.md)
- [Rate cards: 'Any stop' conditions and metrics (what, why and how)](https://help.qargo.com/us/articles/669052-rate-cards-any-stop-conditions-and-metrics-what-why-and-how.md)
