---
title: "Video - How to manage orders and loads in the Distribution planning view?"
description: "The Planning legs view is split into two stacked tables: orders still to plan on top, planned loads below. Planners can build, extend, and merge multi-stop loads directly from there instead of working from a flat, ungrouped list."
url: https://help.qargo.com/us/articles/816694-video-how-to-manage-orders-and-loads-in-the-distribution-planning-view
locale: us
updated: 2026-09-01
---

# Video - How to manage orders and loads in the Distribution planning view?

This video explains how the Distribution planning view is used and interpreted:

::embed{src="https://watchclueso.com/embed/csdw6r6wn1ieaw70"}

:::callout{tone="warning"}
‼️ Sequences that are physically impossible, such as a delivery before its own pickup, cannot be saved when resolving stop order warnings.
:::

Read this article for a step-by-step guide: **[Planning - Distribution planning view](https://help.qargo.com/us/articles/804948-planning-distribution-planning-view).**


## Related articles

- [Video: How to add time window columns to the To plan overview?](https://help.qargo.com/us/articles/768048-video-how-to-add-time-window-columns-to-the-to-plan-overview.md)
- [Video: How to use 'To plan: Loads' mode](https://help.qargo.com/us/articles/711679-video-how-to-use-to-plan-loads-mode.md)
- [PLANNING - Custom planboard layouts](https://help.qargo.com/us/articles/825612-planning-custom-planboard-layouts.md)
- [Video - How to split a shipment into parallel stages?](https://help.qargo.com/us/articles/816795-video-how-to-split-a-shipment-into-parallel-stages.md)
- [Video: Assign the previous container or trailer to orders on a load](https://help.qargo.com/us/articles/718295-video-assign-the-previous-container-or-trailer-to-orders-on-a-load.md)
