---
title: "PLANNING - Distribution planning view"
description: "The Distribution planning view splits the Planning Legs into two stacked tables, orders still to plan and planned loads, so planners running multi-stop distribution work can build, extend, and merge loads directly from the view."
url: https://help.qargo.com/us/articles/804948-planning-distribution-planning-view
locale: us
updated: 2026-09-02
---

# PLANNING - Distribution planning view

## Key terminology  {#h_d79c88b34c}

| **Term** | **Definition** |
| --- | --- |
| Load | A sequence of stops (orders) completed by a vehicle within a single distribution round. |
| Order | A delivery or pickup job that requires planning and assignment to a load. |
| Stage (leg) | A single point within a load, representing the pickup or drop-off of an order. |
| Primary resource | The main asset assigned to perform a load, such as a specific vehicle or driver. |
| Optimizer | Qargo's engine that automatically determines the most efficient route and sequence for stops within a load. |

## Use cases {#h_843d9b2d24}

-   Distribution (messagerie) planners managing daily multi-stop rounds can sort unplanned orders by the combined **Pickup/Delivery** location column and group orders by geography before they go onto a route.
-   Planners extending an existing round with late incoming orders can merge those orders into the load and let the optimizer insert each stop at the right point in the route.
-   Consolidation planners can see at a glance which legs belong to which load, with every order stage nested under its load summary row, instead of one flat list.

## 🎥 Watch the video on the Distribution planning view  {#h_08ff533c7e}

::embed{src="https://watchclueso.com/embed/csdw6r6wn1ieaw70"}

## Open the Distribution planning view {#h_d8a4396d84}

1.  **Navigate** to the **Planning** module.
2.  **Select** the **Legs view** from the planning view options.

With the feature enabled, the Legs view shows two stacked tables:

-   The top table lists orders still to plan.
-   The bottom table lists planned loads, with each order stage nested under its load summary row.
-   Horizontal scrolling stays linked so the columns line up, and each table scrolls vertically on its own.

![](https://help.qargo.com/media/047c62baa582-download.png)

## Read the load and order rows {#h_9ce2460a0c}

Every value is pinned to its level, so a load row and a stage row never mix totals:

-   A load row shows the peak quantity carried at any point in the load and the route of the whole load.
-   A stage row shows what is loaded or unloaded at that stop and that order's own route, with the part belonging to the current load highlighted.
-   In the planned table, a filter selects loads, not legs: a matching load stays fully visible with all its orders, so a planner can see what else that truck is carrying.

## Create a new load from unplanned orders {#h_e8c912f7dd}

1.  **Select** the checkboxes of the orders to plan in the top table.
2.  **Click** **Create new load**.
3.  **Review** the new load: the optimizer inserts each stop at the right point in the route.

::video{src="/media/video/04b9a88424fd-1da89506-cbda-4385-a6da-65e7a27ffe73.mp4"}

## Add orders to existing loads {#h_988aad08cd}

There are two ways to quickly drop an order into an existing load.

1.  **Select** the checkboxes of the order(s) to add.
2.  **Hover** over the planned view on the left until an arrow appears
3.  **Click** the arrow at the location where the order should be added

Another way to add an order to an existing load is **drag-and-drop**.

1.  **Click and hold** the order in the To plan view
2.  **Drag** the order down to the load it should be added to
3.  **Drop** the order on the location in the load where it should land

::video{src="/media/video/2bb2f13572df-a408fa90-450a-48ab-9ffb-28761089bd6d.mp4"}

## Merge orders into an existing load {#h_b597352dc9}

1.  **Select** one or more orders in the to-plan table together with one or more existing **loads** in the planned table.
2.  **Merge** the selection into a single load: the existing optimizer inserts each stop at the right point in the route.
3.  **Check** the primary resource in the merge modal. It is pre-filled when exactly one load is selected, and left empty when several loads are selected, instead of the system picking one for the planner.
4.  **Confirm** to save the merged load.

![](https://help.qargo.com/media/d0138ae640fd-download--1-.png)

:::callout{tone="note"}
‼️ When an order is merged with an existing load, the order is added at the correct point in the route. When **an order is merged with another order** **within an existing load**, the order is removed from the existing load and a new load is created containing the merged orders. See below for more information.
:::

## Merge orders into another order in an existing load {#h_ab0759884a}

1.  **Select** one or more orders in the to-plan table together with one or more existing **orders** in the planned table.
2.  **Merge** the selection into a new load: the optimizer takes the planned order out of the existing load and creates a new load with the order from the To plan board.
3.  **Add** a primary resource in the merge modal. It is not pre-filled, since a new load is created.
4.  **Confirm** to save the merged load.

![](https://help.qargo.com/media/fbb5608d012d-download--2-.png)

## Resolve stop order warnings {#h_07c4aea8ef}

When the optimizer cannot work out where an order's stops belong, the load is flagged instead of blocking the planner.

![](https://help.qargo.com/media/401ba6614d26-download--3-.png)

1.  **Find** the flagged load: a warning icon replaces the load row's checkbox, and the load is listed in an alert box.
2.  **Click** **the load** in the alert box to open the load details on the Route section.
3.  **Set** the correct stop sequence and save.

:::callout{tone="warning"}
‼️ Sequences that are physically impossible, such as a delivery before its own pickup, cannot be saved when resolving stop order warnings.
:::

## Troubleshooting {#h_b3605e08bf}

| **Issue** | **Resolution** |
| --- | --- |
| The two stacked tables are not visible and the Legs view still shows a single table | The `has_split_legs_view` tenant flag is not yet enabled. The rollout is progressive; contact the Qargo account manager or Qargo Support. |
| The planned table cannot be narrowed down to only the legs that match a filter | By design, filters in the planned table select whole loads so every order in the load stays visible. Use search to find one specific order. |
| A stage cannot be moved straight from one load to another | Direct load-to-load moves are not included. Unplan the stage back to the to-plan table first, then merge it into the target load. |
| Column changes apply to both tables at once | Both tables share one column set. Per-table column customization, expanding/collapsing load rows, and choosing which column stays sticky are planned for a later iteration. |
| Orders are not assigned automatically to a recurring route | Recurring routes (tournées) and auto-assignment by ZIP code are part of the separate Recurring routes feature, not this view. |

## Related content {#h_4cc03ad109}

-   [PLANNING - Planning views options](https://help.qargo.com/us/articles/133850-planning-planning-views-options)
-   [PLANNING - Route optimization](https://help.qargo.com/us/articles/133846-planning-route-optimisation)

Still have questions? Browse the full FAQ list or contact Qargo Support.


## Related articles

- [Video - How to manage orders and loads in the Distribution planning view?](https://help.qargo.com/us/articles/816694-video-how-to-manage-orders-and-loads-in-the-distribution-planning-view.md)
- [PLANNING - Pickup/Delivery column on To plan: Orders view](https://help.qargo.com/us/articles/819093-planning-pickup-delivery-column-on-to-plan-orders-view.md)
- [Planning: select and drop](https://help.qargo.com/us/articles/267391-planning-select-and-drop.md)
- [Planning loads in bulk (groupage)](https://help.qargo.com/us/articles/133845-planning-loads-in-bulk-groupage.md)
- [Planning: board filter options](https://help.qargo.com/us/articles/220218-planning-board-filter-options.md)
