---
title: "Rates: consolidating fixed resource costs across multiple loads (what, why, and how)"
description: "Spread a fixed daily or weekly resource cost evenly across all loads that share the same resource, instead of charging it in full to every load."
url: https://help.qargo.com/us/articles/739923-rates-consolidating-fixed-resource-costs-across-multiple-loads-what-why-and-how
locale: us
updated: 2026-07-27
---

# Rates: consolidating fixed resource costs across multiple loads (what, why, and how)

## Summary {#h_c80322bb15}

-   **What is it?**

    -   A new **Consolidation: split fixed cost over loads** setting on cost rate cards (internal and contract carrier) under **Rates > Contract carrier costs**. It mirrors the existing **Consolidated rating** on the sales side.
    -   The fixed day or week rate is split equally across the loads in a group.
-   **Why use it?**

    -   Fixed daily and weekly resource costs (driver, vehicle, trailer) were applied in full to every load. A resource running several loads in a day had its cost counted multiple times, which made profitability reporting unreliable.
-   **How does it work?**

    -   Loads are grouped by the same resource and the same day or week.
    -   The matched fixed rate is divided across the loads in the group, and the split amount is shown in the **Resource costs** section on each load.

## Prerequisites {#h_4cbc1f82a0}

-   **Super admin** access to enable the **Consolidation: split fixed cost over loads** option and pick the grouping criterion on the relevant cost rate card under **Rates > Internal costs** (or **Rates > Contract carrier costs**). See [Cost calculation load](https://help.qargo.com/us/articles/133801-cost-calculation-trip) for how cost rate cards are set up.

## Use cases {#h_48bc2e0f4f}

-   A driver on a fixed daily rate who runs several loads in one day, where the full day rate should be shared across those loads rather than charged to each one.
-   Spreading a fixed weekly resource cost across all loads run by that resource in the same calendar week.

## Terminology {#h_5f55ba80d7}

| **Term** | **Definition** |
| --- | --- |
| **Consolidation: split fixed cost over loads** | The cost rate card setting that spreads a fixed resource cost across grouped loads. |
| **Grouping criterion** | The rule used to group loads: same start date, same end date, same start week, or same end week. |
| **Fixed rate** | A fixed daily or weekly amount on a cost rate card, as opposed to a metric or formula-based rate. |
| **Resource costs** | The section on a load that displays the cost allocated to that load, including the split amount. |

* * *

## Configuring cost consolidation {#h_185edc1073}

1.  Navigate to **Rates > Internal costs** (or **Rates > Contract carrier costs**) and open the relevant cost rate card.
2.  Open the **Consolidation: split fixed cost over loads** dropdown and select a consolidation mode (the default is **No consolidation**).
3.  Select a grouping criterion: **same start date**, **same end date**, **same start week**, or **same end week**.
4.  Select **Recalculate** on each affected load to apply the split (the split is not applied automatically).
5.  Verify the split amount in the **Resource costs** section on each affected load.

Conditions are supported (for example, a different fixed rate per resource group), and the matched fixed rate is divided across the loads in the group.

![](https://help.qargo.com/media/011f08c35e53-Screenshot-2026-07-08-at-12_08_53.png)

## Worked example {#h_c62a53afab}

A driver costs 475 EUR per day and runs 3 loads on Monday. Without consolidation, each load is charged the full 475 EUR, so the day reports 1,425 EUR, almost three times the real cost. With consolidation set to **same start date**, the 475 EUR is split equally across the 3 loads. Each load is charged 158.33 EUR, and the day correctly totals 475 EUR.

* * *

## Troubleshooting {#h_d1efc21bf3}

| **Issue** | **Cause / resolution** |
| --- | --- |
| A per-km or formula-based cost is not split. | Only fixed amounts are consolidated. Metric or formula-based rates are not split across loads. |
| Night-shift loads crossing midnight are not grouped as expected. | Grouping uses whole calendar days. Loads are grouped by their start date or end date; there is no time-range option. |
| Week grouping does not match the operational week. | Week grouping uses the calendar week. A configurable working-week length (5, 6, or 7 days) is not supported. |

## Limitations {#h_51a2677a41}

-   Only fixed amounts are consolidated; metric or formula-based rates (for example, per km) are not split.
-   The split is equal across loads, or fully assigned to the first load; there is no weighted split by distance, time, or freight.
-   Duration-based cost (start of the first load to end of the last load) is not included and is deferred to v2.
-   Week grouping uses the calendar week; a configurable working-week length is not supported.


## Related articles

- [Rates: consolidated rating](https://help.qargo.com/us/articles/276838-rates-consolidated-rating.md)
- [Rate card FAQ – FAQ rate cards](https://help.qargo.com/us/articles/445955-rate-card-faq-faq-rate-cards.md)
- [Invoices: Auto-assign invoice groups to orders](https://help.qargo.com/us/articles/322552-invoices-auto-assign-invoice-groups-to-orders.md)
- [Invoices - Setting the Invoice from date on orders](https://help.qargo.com/us/articles/868703-invoices-setting-the-invoice-from-date-on-orders.md)
- [Loads: expected vs. actual costs](https://help.qargo.com/us/articles/630077-loads-expected-vs-actual-costs.md)
