---
title: "Video: How to use 'To plan: Loads' mode"
description: "The 'To plan: Loads' option in the planning board To plan dropdown lists every load that's still waiting for a real resource: both loads parked on a dummy resource and loads with no resource at all, gathered in one place."
url: https://help.qargo.com/us/articles/711679-video-how-to-use-to-plan-loads-mode
locale: us
updated: 2026-06-18
---

# Video: How to use 'To plan: Loads' mode

This video explains how to use the **To plan: Loads** planning board:

::embed{src="https://watchclueso.com/embed/hyrhtqqa8xhjcul7"}

Read the full article about this feature: 🔗

Qargo supports two ways to create a load with a date/time but no real resource assigned yet:

1.  **Plan a new load and skip the resource (leave it empty)**

    1.  In the planning board, select an order > click **Create new load** > **Merge** the load with a date and hour only.
    2.  **Save** the load.
2.  **Preplanning with dummy resources**

    1.  Go to **Resources** > add a new driver/vehicle > toggle **Dummy resource** on.
    2.  On the planning board, filter to show **Only dummies** (or **All resources**).
    3.  **Add orders** to the dummy resource.

More on this topic is available here: [Preplanning loads using dummy resources](https://help.qargo.com/us/articles/238783-preplanning-trips-using-dummy-resources).


## Related articles

- [Resources – Add resources (drivers, vehicles, contract carriers, containers)](https://help.qargo.com/us/articles/133834-resources-add-resources-drivers-vehicles-contract-carriers-containers.md)
- [Video: How to add a stop to a load from the open load detail?](https://help.qargo.com/us/articles/769111-video-how-to-add-a-stop-to-a-load-from-the-open-load-detail.md)
- [Video: How to add time window columns to the To plan overview?](https://help.qargo.com/us/articles/768048-video-how-to-add-time-window-columns-to-the-to-plan-overview.md)
- [Planning: board filter options](https://help.qargo.com/us/articles/220218-planning-board-filter-options.md)
- [Planning: plan resource to order](https://help.qargo.com/us/articles/292119-planning-plan-resource-to-order.md)
