# Loads: expected vs. actual costs

:::callout{tone="info"}
💬 **Feature requires activation.** If this option is not available, contact the Qargo account manager.
:::

## Summary {#h_75f28a9bd1}

### What is this feature? {#h_a04b106b1e}

Expected vs. actual costs gives a side-by-side comparison of what a load was expected to cost (at the time of planning) and what it actually cost once completed.

### Why does it exist? {#h_53ffd190ac}

Before this feature, the original planned cost was overwritten when a load was carried out. There was no way to look back and see whether a load cost more or less than expected, or to track planning accuracy over time.

### How does it work? {#h_e457dad3c8}

-   **Planned status:** Qargo calculates costs based on the configured rate cards and charge configurations.

    -   Calculations are stored as the **Expected amount**, a snapshot of the cost while the load is still in **Planned** status (or earlier).

-   **In Transit** or later:

    -   The expected amount is locked. Any changes made after that point (for example, extra km driven, a manual override, or a carrier invoice received from a contract carrier) are reflected in the **Actual amount** only.

* * *

## Prerequisites {#h_1069294483}

Before the expected vs. actual costs columns are visible, the following must be in place:

-   **Feature activation:** this feature is controlled by a setting that is turned off by default.

-   **Cost calculations configured:** rate cards or internal cost calculations must already be set up in Qargo for expected costs to be calculated. See the [Cost calculation trip](https://help.qargo.com/us/articles/133801-cost-calculation-trip) article for guidance on setting these up.

* * *

### Terminology {#h_710c8cb391}

| **Term** | **Meaning** |
| --- | --- |
| **Expected amount** | The cost of a charge as calculated while the load was in Planned status or earlier. Locked when the load moves to In Transit. |
| **Actual amount** | The current charge amount, reflecting the final cost after operational data, manual adjustments, or carrier invoice matching. This is the amount sent to the accounting package. |

* * *

### Where to find expected costs {#h_f1c7c3f6fe}

Once the feature has been enabled, the expected and actual cost columns appear in three places on a load:

-   **Load detail – P&L section**: The clearest side-by-side view. Shows total expected costs vs. total actual costs for the load.
-   **Order summary**: Expected and actual cost columns are visible for each order linked to the load.
-   **Charge table**: Each individual cost line on the load shows an _Expected amount_ column alongside the standard cost column.

![](https://help.qargo.com/media/e9285f15e3df-image.png)

### Expected and actual costs on the carrier invoice detail view {#h_d39b3da13e}

Expected cost data is now visible directly on the carrier invoice detail view. There is no longer any need to open the P&L section of each linked load to compare planned and invoiced amounts.

![](https://help.qargo.com/media/9bc69673cf3c-Screenshot-2026-06-08-at-12_01_28.png)

🎥 This video shows how estimated costs compare with actual costs:

::embed{src="https://watchclueso.com/embed/df26gryx9vet1d4s"}

When **Has expected charges** is enabled, two columns appear on the carrier invoice:

-   **Expected cost**: The cost expected when the load was planned.
-   **Cost difference**: Expected cost minus actual cost.

    -   **Positive** = the contract carrier charged less than expected.
    -   **Negative** = the contract carrier charged more than expected.

No additional setup is needed. If the feature is disabled, the invoice stays unchanged.

* * *

### Refreshing the expected amount {#h_15dbf77684}

The expected cost can be updated, for example after correcting a planning error before a load departs.

1.  Open the **load detail** page.
2.  Find the charge to update.
3.  Click **Recalculate**.
4.  Select **Update expected amount**.

This updates the expected cost to the current actual cost. This is possible while the load is **Planned** or **In Transit**.

* * *

## Reporting on expected vs. actual costs {#h_32bf1e2c5f}

Use **dashboards/BI reporting** to analyze expected vs. actual costs.\
The following fields are available on the carrier invoice line items:

-   `expected_charge_amount`
-   `expected_charge_amount_tenant_currency`

**In-app filtering and sorting by cost difference is not currently available.**

* * *

### Common use cases {#h_f6616ade5f}

-   **Check planning accuracy**

    -   A load was expected to cost **€120**, but the actual cost was **€132**.
    -   The **€12 difference** shows the planner that the load cost more than expected.
-   **Check contract carrier invoices**

    -   The expected cost was **€120**, but the contract carrier invoiced **€132**.
    -   Finance can quickly spot the difference and check why the invoice is higher.
-   **Review load profitability**

    -   After a load, an operations manager can compare the expected and actual costs.
    -   This can help identify routes or resources that regularly cost more than planned.
-   **Analyze cost trends**

    -   Finance can use BI dashboards to compare expected and actual costs across **routes, contract carriers, or time periods**.
    -   This helps identify patterns and improve future cost planning.

* * *

### Limitations {#h_d277f5a491}

-   Expected costs are only available for loads planned **after the feature was enabled**.
-   Filtering or sorting by cost difference is not currently available in the app.
-   Expected and actual costs are **internal only** and are not shown to customers or contract carriers.
-   There are **no automatic alerts** when actual costs exceed expected costs.
-   Deleting and re-adding a charge, or changing the price list for an assigned resource, **resets the expected cost**.
-   Charges added directly to invoices without a linked cost rate card **do not have an expected cost**.

* * *

## Troubleshooting {#h_23afab04c5}

| **Issue** | **What to check** |
| --- | --- |
| Expected cost columns are not visible on the load | The feature may not be enabled for the account. Contact Qargo support to have it activated. |
| The expected cost is empty for some charges | The charge may have been added after the load moved past _Planned_ status, or the charge was deleted and re-added. Only charges that existed while the load was in _Planned_ status have an expected cost. |
| Expected cost equals actual cost even after the load is completed | If no changes were made to costs after planning (same km, no manual adjustments, no carrier invoice with a different amount), expected and actual costs are the same. This is normal. |
| Expected costs are available for some loads but not others | Only loads planned after the feature was enabled have expected cost data. Earlier loads show empty values for expected costs. |
| Cost variance data is not showing in the BI dashboard | Confirm with the data team that the BigQuery pipeline for expected/actual cost data has been set up. BI connectivity requires a separate setup step. |


## Related articles

- [Video: Expected versus actual costs on carrier invoices](https://help.qargo.com/us/articles/818981-video-expected-versus-actual-costs-on-carrier-invoices.md)
- [FAQ: Viewing planned vs. actual times for a load](https://help.qargo.com/us/articles/459000-faq-viewing-planned-vs-actual-times-for-a-load.md)
- [Invoices – Loads to bill: Charge view and amount filter](https://help.qargo.com/us/articles/692497-invoices-loads-to-bill-charge-view-and-amount-filter.md)
- [Dashboards: summary of options](https://help.qargo.com/us/articles/329143-dashboards-summary-of-options.md)
- [Orders: orders list view functions](https://help.qargo.com/us/articles/133839-orders-orders-list-view-functions.md)