# Resource availability overviews

Several pages in the Planning module give a clear visualization of resource availability. This helps planners make planning decisions quickly and efficiently.

## Resource availability overview {#h_9475830979}

The **_'Resource availability'_** view is available under the **Planning** tab:

![](https://help.qargo.com/media/ee3c084c9dc1-image.png)

This view gives an easy overview of:

-   **Unavailabilities of resources**: shows when drivers/vehicles are not available due to holidays, repairs, etc.

    ![](https://help.qargo.com/media/c1e3d630bcb2-image.png)

-   **Temporary resource combinations**: easily create combinations that will be used for a specific period of time:

    ![](https://help.qargo.com/media/504505726519-image.png)

    ![](https://help.qargo.com/media/e040d9351d47-image.png)


The view can show a period of:

-   1 month: use the arrows to easily move between months

    ![](https://help.qargo.com/media/cbc6110e65ba-image.png)

-   Date range: a shorter period can also be selected with the date range functionality

    ![](https://help.qargo.com/media/7b778b20df2c-image.png)


* * *

## Trailer / container availability {#h_01fd3e8b1f}

The resource board reflects **real-time availability** for trailers and containers. As soon as a load is marked as completed, the linked trailer or container is immediately shown as **Available**. There is no need to wait until the end of the day.

### How availability status works {#h_bcbe5d8b01}

Trailers and containers displayed on the planning resource board show one of the following statuses:

| **Status** | **Meaning** |
| --- | --- |
| **Available** | The resource is free and can be assigned to a new load |
| **In use** | The resource is assigned to an active (not yet completed) load |
| **Parked** | The resource is parked and not currently in active use |

### Status update on load completion {#h_32464c9327}

Previously, a trailer or container stayed marked as **In use** or **Parked** for the rest of the day, even after its load was completed. This made it unclear whether a resource was actually free for reassignment.\
Now, the availability status updates **immediately** when a load is completed:

-   As soon as a load is **marked as completed** (via the driver mobile app or manually by a planner), the linked trailer or container switches to **Available** on the resource board
-   Planners can reassign the resource to a new load right away

![](https://help.qargo.com/media/42de1d978ccd-image.png)

* * *

### Temporary resource combinations {#h_9ba5a7c27d}

Qargo uses the concept of combinations, which means drivers/vehicles that operate together. There are:

-   **_Fixed combinations:_** these are configured in the resource configuration, which means those resources are always together on the planning board. See this [help article](https://help.qargo.com/us/articles/133814-add-a-resource-combination) for more information.
-   **_Temporary combinations:_** these are combinations for a limited period of time, e.g., a day, a week, etc. Temporary combinations could already be created, but there was no good overview of which temporary combination was active on which days. The resource availability view now solves this.

**_Example – Eliza:_** Eliza is not in a fixed resource combination but has been added to a temporary one (VAN) from January 28 to January 30. On January 31, Eliza is driving a truck.

![](https://help.qargo.com/media/7def456563aa-image.png)

There are 2 ways to create a temporary resource combination:

1.  **_Resource availabilities view:_** Click the **_\+ icon_** and select **Create temporary combination**. Enter the:

    -   Date range in which the temporary combination is active
    -   Resource group it belongs to
    -   Resources that are in the combination

        ::video{src="/media/video/d6636da25154-2025-01-29_16-11-24-1-.mp4"}

2.  **_Timeline/block planning view_**: Dragging a resource from the resources to plan onto a resource on the planning automatically creates a temporary resource combination for the selected dates. This is much faster, but the resource group and the duration of the temporary combination cannot be changed.

    ::video{src="/media/video/a173bb4f4779-2025-01-29_16-20-37-1-.mp4"}


* * *

## Availability visibility  {#h_0a96a75f71}

When resources are shown in the planning view (see more details in [👉](https://intercom.help/qargo-tech-ltd/en/articles/8795402-customise-planning-view)**[Customize planning view](https://help.qargo.com/us/articles/133851-customise-the-planning-view))**, the **_Availability_** is shown based on the date range selected in the planning table.

![](https://help.qargo.com/media/e673158f5b40-image.png)

The _Pre-planning view_ (panel at the top of the screen) shows the resources grouped by combination, drivers, vehicles, etc. Both _trailers and containers_ can now be seen in this view.

![](https://help.qargo.com/media/cad46ee7cd16-image.png)

The **'Available?'** column shows the current status of the resource. The _'Next unavailability'_ column shows any current or upcoming unavailabilities. This gives users a clear view of the resource availability now and of anything that could affect upcoming planning.

![](https://help.qargo.com/media/bb778a65f203-image.png)

There are 4 status options available:

-   **Available** – Indicated by a check mark. The resource has free time in the selected range and can be planned.
-   **Outside shift schedule** – Every day in the selected range is a rest day in the resource's shift schedule.
-   **Unavailable** – Indicated by X. The resource is unavailable for planning due to a logged unavailability, i.e., holiday or maintenance.
-   **In use / Parked** – The resource is already in use on planned loads, parked (trailer / container) or at end of day (driver).

![](https://help.qargo.com/media/4de9609ceadf-image.png)

This column can be filtered by selecting any of the statuses. More than one status can also be selected.

:::callout{tone="info"}
📚 The same four statuses are used by the _Available?_ filter on the planning board (_Loads: Timeline_, _Loads: Blocks_, _To plan: Resources - Timeline_ and _Pre-planning_). The filter counts planned loads and only looks at the time after the red line (the current time). See [PLANNING - Board Filter options](https://help.qargo.com/us/articles/220218-planning-board-filter-options).
:::

\
​**Trailers / containers view:**\
The **_'Available'_** column also shows in the planning table when looking at planning for both trailers and containers:

![](https://help.qargo.com/media/30a2a907f6e4-image.png)

* * *

## Unavailabilities in the Blocks view {#h_ba30c42f17}

Resource unavailabilities (holidays, sick days, shift schedule absences and notes) are now always visible in the **Blocks planning view**, even when loads are already assigned to the same resource row. This keeps planners fully informed of scheduling constraints without switching to the Timeline view.

\*\*\[Screenshot: Blocks view showing a resource row with both a planned load and an unavailability indicator visible side by side\]\*\*

### How unavailabilities are displayed {#h_8f1597449f}

Unavailability indicators appear directly on the resource row in **Blocks view** in all of the following states:

-   **Empty row:** the unavailability is shown on its own, with a drop zone available for assigning a new shipment
-   **Row with loads assigned:** the unavailability indicator remains visible next to the planned load(s), sorted by start time
-   **Row with loads and multiple unavailabilities:** each unavailability keeps its own position in the row, sorted by start time, with individual drop zones where applicable

### Planning shipments next to unavailabilities {#h_c20b24a1d4}

In **Blocks view**, a shipment can now be dragged and dropped directly next to an unavailability or a note (provided the unavailability or note has an end date set). The system automatically calculates the shipment start time based on the position of the unavailability.

1\. **Navigate** to the planning board and select **Blocks view** from the view selector\
2\. **Locate** the resource row containing the unavailability\
3\. **Drag** the unplanned shipment from the \*To plan\* panel and drop it in the drop zone next to the unavailability indicator\
4\. **Confirm** the load is planned with the correct start time relative to the unavailability

![](https://help.qargo.com/media/293dbb14cf5a-image.png)

:::callout{tone="info"}
📚 The drop zone appears on both sides of a block only when an end time has been set. If there's no end time, a drop zone is shown on the left only. Loads can still be assigned to a resource even if it's marked as unavailable.
:::

## Limitations {#h_b738010fc4}

| **Limitation** | **Description** |
| --- | --- |
| Timeline view behavior unchanged | This improvement applies only to the **Blocks view**. The Timeline view continues to behave as before. |
| _'Used on other load'_ indicators | Indicators showing that a resource is allocated to a load in a different planning group may not display in **Blocks view** if they are rendered through a separate mechanism from standard unavailabilities. |
| Notes without an end date | Notes with no end timestamp do not generate a right-hand drop zone, as the system cannot calculate a start time for the adjacent shipment. |

* * *

## Viewing resource availability in the 👉BI dashboard {#h_6020768c54}

\
Navigate to the **Dashboard > Resource expiration** tab to access the extended list of unavailabilities.

![](https://help.qargo.com/media/ffe478c89623-image.png)

\
Apply the date range filter and click **Apply**

![](https://help.qargo.com/media/aa1603083bef-image.png)

\
Click the **Apply** field, also located on the right side of the page

![](https://help.qargo.com/media/d5c040e762a0-image.png)

\
Select the category and resource type if applicable, and apply the changes:

![](https://help.qargo.com/media/0016bcca5d4c-image.png)

![](https://help.qargo.com/media/c2bf50d8e76f-image.png)

\
Scroll up and down to locate the data to view, and export the data of the desired view:

![](https://help.qargo.com/media/4a241ff764b1-image.png)


## Related articles

- [Planning – Trailer and container availability status on the resource board](https://help.qargo.com/us/articles/600484-planning-trailer-and-container-availability-status-on-the-resource-board.md)
- [Planning — Per-day resource availability in To Plan: Resources](https://help.qargo.com/us/articles/712533-planning-per-day-resource-availability-in-to-plan-resources.md)
- [Planning: plan resource to order](https://help.qargo.com/us/articles/292119-planning-plan-resource-to-order.md)
- [Setting resource availability](https://help.qargo.com/us/articles/133844-setting-resource-availability.md)
- [Planning - Container planning](https://help.qargo.com/us/articles/133853-planning-container-planning.md)