# RATE CARD - Multimodal pricing condition configurations

## Summary {#h_c1cd6a5ff1}

-   **What is included?**

    -   Three new condition types are now available on **customer price lists and subcontractor (cost) rate cards:** _Stage type_, _Resource type_, and _Intermodal connection_.
-   **Why was this added?**

    -   Multimodal transport pricing depends on what the route looks like: whether it includes a rail or sailing leg, what equipment is used, or which specific intermodal connection is planned. Without these conditions, prices and third-party costs that vary by leg, equipment, or connection had to be entered manually.
-   **How does it work?**

    -   Each condition can be added to an existing or new rate card line and combined freely with other conditions. _Stage type_ checks the legs present in the route. _Resource type_ checks the primary or secondary resource on the trip. _Intermodal connection_ matches a specific operator + connection (for example, STDR-DUB).

## Prerequisites {#h_2c6b90259d}

-   Customer or subcontractor rate cards must already be set up. See [RATES - Rate Card Customers](https://help.qargo.com/en/articles/133865-rates-rate-card-customers) and [Cost Calculation - Trip Costs](https://help.qargo.com/en/articles/133801-cost-calculation-trip).
-   For _Intermodal connection_ conditions, the relevant intermodal connections must be configured in _RESOURCES>Intermodal operators_

    -   Select the intermodal operator and add 'Intermodal connections'. See [INTERMODAL - Create & Update Intermodal timetables](https://help.qargo.com/en/articles/291991-intermodal-create-update-intermodal-timetables).
-   For _Resource type_ conditions, the secondary resource (trailer, container, chassis) must be assigned on the trip for the rule to evaluate as expected.

## Use Cases {#h_a0ca04fe5a}

-   **Road fuel surcharge conditioned on rail leg.** A customer's road fuel surcharge differs depending on whether the route includes a rail transfer leg. The _Stage type_ condition allows the surcharge to be configured once and triggered automatically on routes containing a rail leg.
-   **Limited Quantity (LQ) surcharge on sailing legs.** When a shipment is flagged as Limited Quantity and the planned route includes a sailing transfer leg, an additional LQ surcharge applies. The _Stage type_ condition makes this an automated rule rather than a manual addition.
-   **Cost rates by secondary resource type.** Carrier or subcontractor cost rates differ based on whether a transfer leg uses a trailer or a container. The _Resource type_ condition on the cost rate card differentiates rates based on the secondary resource actually assigned to the trip.
-   **Connection-specific surcharges (revenue).** A shipment to Dublin can travel via direct sailing (STDR-DUB) or via Zeebrugge (STDR-ZEE + ZEE-DUB). With the _Intermodal connection_ condition, each route variant can carry a different rate without manual selection.
-   **Connection-specific third-party costs (cost).** A "Cost Reallocation" or third-party resource on intermodal trips can now be priced automatically based on the planned intermodal connection, removing the need for manual cost entry per trip.

* * *

## Terminology {#h_14da6b97e1}

| **Term** | **Definition** |
| --- | --- |
| _Stage type_ | The classification of a transport leg in Qargo: Transfer, Collect, Delivery, or Empty. |
| _Resource type_ | The kind of resource assigned to a trip (Trailer, Container, Chassis, Ferry resource). Applies to the primary or secondary resource. |
| _Intermodal connection_ | A pre-defined route segment between two points operated by an intermodal carrier, such as STDR-DUB. |
| _Subcontractor rate card_ | A cost-side rate card used to calculate third-party costs for a trip, including reallocations and external resources. |
| _Customer price list_ | A revenue-side rate card defining what is charged to a customer for a transport order. |

:::callout{tone="info"}
🧰 New conditions are available out of the box on existing customer and subcontractor rate cards. No feature flag is required.
:::

* * *

## Stage Type Condition {#h_ef233c40c1}

The _Stage type_ condition triggers a charge or cost when the planned route contains at least one leg of the selected stage type.

1.  **OPEN** the relevant rate card in _RATES > Rate card customers_ (revenue) or _RATES > Cost Calculation Trip > Subcontractor Rates_ (cost).
2.  **SELECT** the charge line where the condition should apply.
3.  **ADD** a new condition and **CHOOSE** _Stage type_.
4.  **PICK** one or more values: _Transfer_, _Collect_, _Delivery_, _Empty_.
5.  **SAVE** the condition.

The condition evaluates to true if any leg in the route matches the selected stage type.

![](https://help.qargo.com/media/934ca8591c0b-image.png)

:::callout{tone="info"}
📚 Stage type conditions evaluate across the full route. An order with both a collect leg and a transfer leg matches a "Transfer" stage type condition, even if the charge is logically intended for the transfer leg only. To narrow the charge further, combine the condition with a _Resource type_ or _Intermodal connection_ condition.
:::

* * *

## Resource Type Condition {#h_d16b7304e3}

The _Resource type_ condition checks which resource type is assigned to the trip. It is available on both customer price lists and subcontractor rate cards.

1.  **OPEN** the rate card and the charge line.
2.  **ADD** a condition and **SELECT** _Resource type_.
3.  **CHOOSE** _Primary resource_ or _Secondary resource_ depending on which side of the assignment the condition should evaluate.
4.  **PICK** one or more resource types: _Trailer_, _Container_, _Chassis_, _Ferry resource_.
5.  **SAVE** the condition.

![](https://help.qargo.com/media/2cd4b4a72424-image.png)

:::callout{tone="note"}
‼️For the condition to evaluate correctly, the relevant resource must already be assigned to the trip when the calculation runs. Cost calculations on unplanned trips will not match a _Resource type_ condition until planning is complete.
:::

* * *

## Intermodal Connection Condition on Customer Price Lists {#h_f61ab00862}

The _Intermodal connection_ condition follows the same Intermodal > Connection pattern already in use on intermodal cost rate cards.

1.  **OPEN** the customer price list and the relevant charge line.
2.  **ADD** a condition and **SELECT** _Intermodal connection_.
3.  **PICK** the intermodal operator first, then the specific connection (for example, _P&O > STDR-DUB_).
4.  **SAVE** the condition.

![](https://help.qargo.com/media/ca1df69b8e71-image.png)

:::callout{tone="info"}
📚 The charge applies only when the selected connection appears in the planned route.
:::

* * *

## Intermodal Connection Condition on Subcontractor Rate Cards {#h_2869877075}

On subcontractor (cost) rate cards, the _Intermodal connection_ condition is paired with additional fields used to refine the match.

1.  **OPEN** the subcontractor rate card and the charge line.
2.  **ADD** a condition and **SELECT** _Intermodal connection_.
3.  **PICK** the intermodal operator and the specific connection.
4.  **CONFIGURE** any additional fields that apply: _Accompanied_, _Number of drivers_, _Resource type_, _Temperature plugin_, _Vehicle/container length_, _Is loaded_.
5.  **SAVE** the condition.

::video{src="/media/video/92c2bc794360-2026-05-13_12-10-53--281-29.mp4"}

:::callout{tone="info"}
📚 Combining _Intermodal connection_ with _Resource type_ allows precise cost differentiation - for example, a different cost rate for _STDR-DUB + Trailer_ versus _STDR-DUB + Container_.
:::

* * *

## Combining Conditions {#h_883d841b25}

All three new conditions can be combined with each other and with existing rate card conditions. A typical combination on a subcontractor rate card might be:

-   _Stage type IS Transfer_
-   _Intermodal connection IS P&O / STDR-ZEE_
-   _Resource type IS Container_

The charge applies only when all conditions evaluate to true on the planned route.

* * *

## Troubleshooting {#h_9c2de79773}

| **Issue** | **Resolution** |
| --- | --- |
| The condition does not appear in the rate card editor | Confirm that the rate card is a customer price list or subcontractor rate card. _Intermodal connection_ is supported on intermodal-eligible rate cards. |
| The _Resource type_ condition does not match | Ensure the secondary resource is assigned to the trip. The condition cannot evaluate before planning is complete. |
| Stage type matches when only one leg should trigger the charge | The condition evaluates across all legs in the route. Combine with a _Resource type_ or _Intermodal connection_ condition to scope the match more narrowly. |
| Existing rate cards still use manual entries for connection-specific costs | New conditions must be added manually. There is no automatic migration tool, and previously invoiced or costed orders are not recalculated retroactively. |
| Intermodal connection list is empty in the picker | Verify that intermodal connections are configured in _RESOURCES > Intermodal Operators > Intermodal Connections_ and that the operator is linked to the relevant rate card. |


## Related articles

- [RATE CARDS — 'Any Stop' Conditions and Metrics — What, Why & How.](https://help.qargo.com/en/articles/669052-rate-cards-any-stop-conditions-and-metrics-what-why-how.md)
- [RATE CARDS — Dependent Calculations — What, Why & How.](https://help.qargo.com/en/articles/669588-rate-cards-dependent-calculations-what-why-how.md)
- [RATE CARDS - Automatically Charge Trip Costs to Customer Orders](https://help.qargo.com/en/articles/600709-rate-cards-automatically-charge-trip-costs-to-customer-orders.md)
- [RATE CARD FAQ - Price by Location](https://help.qargo.com/en/articles/320191-rate-card-faq-price-by-location.md)
- [Add intermodal connections](https://help.qargo.com/en/articles/133803-add-intermodal-connections.md)